Project Control Forensic Delay Analysis For An Australian Metro

Project Control Forensic Delay Analysis For An Australian Metro

A leading Australian metro undertook a major expansion project for southwest line facing delays in regulatory approvals, threatening the project’s overall timeline.

We at Tooltech, supported them in their cost savings vision using – Forensic delay Analysis. The Impact was,
• Early Identification of potential regulatory delays at the project initiation phase.
Proactive Measures to enhance swift communication and collaboration with regulatory bodies. This led to a 20% reduction in approval delays. This avoided significant cost overruns.

Estimated Cost Savings: $2 million

Other Case Studies

Design of multiple Conveyor Types for Panel Board Manufacturing Plant
Design of multiple Conveyor Types for Panel Board Manufacturing Plant
Hydrogen Refuelling Station Design
Hydrogen Refuelling Station Design
Commissioning For Industry 4.0 Powertrain Factory
Commissioning For Industry 4.0 Powertrain Factory
Technical Documentation for Manufacturing & Factory Automation
Technical Documentation for Manufacturing & Factory Automation
E-Mobility Station Design
E-Mobility Station Design
EV car design
EV car design
Modelling & Library Creation
Modelling & Library Creation
Operations & Maintenance Assessment For A Metro Major
Operations & Maintenance Assessment For A Metro Major
Project Planning & Control And Forensic Delay Analysis For The Sydney Metro Project
Project Planning & Control And Forensic Delay Analysis For The Sydney Metro Project
Floating Villa Design
Floating Villa Design