Project Control Forensic Delay Analysis For An Australian Metro

Project Control Forensic Delay Analysis For An Australian Metro

A leading Australian metro undertook a major expansion project for southwest line facing delays in regulatory approvals, threatening the project’s overall timeline.

We at Tooltech, supported them in their cost savings vision using – Forensic delay Analysis. The Impact was,
• Early Identification of potential regulatory delays at the project initiation phase.
Proactive Measures to enhance swift communication and collaboration with regulatory bodies. This led to a 20% reduction in approval delays. This avoided significant cost overruns.

Estimated Cost Savings: $2 million

Other Case Studies

CNC Machining Line Automation For Cylinder Blocks Of A Heavy-duty Pickup Truck
CNC Machining Line Automation For Cylinder Blocks Of A Heavy-duty Pickup Truck
Reverse Engineering Of Diagnostic Equipment
Reverse Engineering Of Diagnostic Equipment
EV car design
EV car design
Powertrain Manufacturing Plant Commissioning
Powertrain Manufacturing Plant Commissioning
3D Web Library Creation
3D Web Library Creation
Electrical Design Optimization And Localisation
Electrical Design Optimization And Localisation
Platform Integration For A Metro Operator For Metropolitan Cities
Platform Integration For A Metro Operator For Metropolitan Cities
Universal CNC Machine Customisation
Universal CNC Machine Customisation
SAP Master Data Management & Procurement Support
SAP Master Data Management & Procurement Support
Inspection & Supervision Support For Lng Tank Fabrication
Inspection & Supervision Support For Lng Tank Fabrication