A leading Australian metro undertook a major expansion project for southwest line facing delays in regulatory approvals, threatening the project’s overall timeline.

We at Tooltech, supported them in their cost savings vision using – Forensic delay Analysis. The Impact was,
• Early Identification of potential regulatory delays at the project initiation phase.
Proactive Measures to enhance swift communication and collaboration with regulatory bodies. This led to a 20% reduction in approval delays. This avoided significant cost overruns.

Estimated Cost Savings: $2 million

Other Case Studies

Electrical Design Optimization And Localisation
Electrical Design Optimization And Localisation
Quick Usage Guides
Quick Usage Guides
SAP Master Data Management & Procurement Support
SAP Master Data Management & Procurement Support
3D Web Library Creation
3D Web Library Creation
Commissioning For Industry 4.0 Powertrain Factory
Commissioning For Industry 4.0 Powertrain Factory
Interiors Daimler
Interiors Daimler
Project Planning & Control And Forensic Delay Analysis For The Sydney Metro Project
Project Planning & Control And Forensic Delay Analysis For The Sydney Metro Project
Ev Charging Station Design
Ev Charging Station Design
New Product Development / Localization – Industrial Cleaning Equipment
New Product Development / Localization – Industrial Cleaning Equipment
Press Tool Design for Heat Exchanger Plates
Press Tool Design for Heat Exchanger Plates