Project Control Forensic Delay Analysis For An Australian Metro

Project Control Forensic Delay Analysis For An Australian Metro

A leading Australian metro undertook a major expansion project for southwest line facing delays in regulatory approvals, threatening the project’s overall timeline.

We at Tooltech, supported them in their cost savings vision using – Forensic delay Analysis. The Impact was,
• Early Identification of potential regulatory delays at the project initiation phase.
Proactive Measures to enhance swift communication and collaboration with regulatory bodies. This led to a 20% reduction in approval delays. This avoided significant cost overruns.

Estimated Cost Savings: $2 million

Other Case Studies

New Product Development / Localization – Industrial Cleaning Equipment
New Product Development / Localization – Industrial Cleaning Equipment
Offshore Development Centre Built Through A Mix Model
Offshore Development Centre Built Through A Mix Model
EV car design
EV car design
Conversion Of Non – Pressurised Mixing Barrel Into A Pressure Vessel
Conversion Of Non – Pressurised Mixing Barrel Into A Pressure Vessel
Platform Integration For A Metro Operator For Metropolitan Cities
Platform Integration For A Metro Operator For Metropolitan Cities
E-Mobility Station Design
E-Mobility Station Design
Floating Villa Design
Floating Villa Design
Application Development & New Product Development For Shipment Measurement System
Application Development & New Product Development For Shipment Measurement System
E-mobility Manufacturing
E-mobility Manufacturing
Quick Usage Guides
Quick Usage Guides