Project Control Forensic Delay Analysis For An Australian Metro

Project Control Forensic Delay Analysis For An Australian Metro

A leading Australian metro undertook a major expansion project for southwest line facing delays in regulatory approvals, threatening the project’s overall timeline.

We at Tooltech, supported them in their cost savings vision using – Forensic delay Analysis. The Impact was,
• Early Identification of potential regulatory delays at the project initiation phase.
Proactive Measures to enhance swift communication and collaboration with regulatory bodies. This led to a 20% reduction in approval delays. This avoided significant cost overruns.

Estimated Cost Savings: $2 million

Other Case Studies

SAP Master Data Management & Procurement Support
SAP Master Data Management & Procurement Support
Commissioning For Industry 4.0 Powertrain Factory
Commissioning For Industry 4.0 Powertrain Factory
Conversion Of Non – Pressurised Mixing Barrel Into A Pressure Vessel
Conversion Of Non – Pressurised Mixing Barrel Into A Pressure Vessel
Path Programming For Robotic Welding In Door Closure Line
Path Programming For Robotic Welding In Door Closure Line
Interiors Daimler
Interiors Daimler
Electrical Design Optimization And Localisation
Electrical Design Optimization And Localisation
New Product Development / Localization – Industrial Cleaning Equipment
New Product Development / Localization – Industrial Cleaning Equipment
Software Design For An Extreme Vision, Signal Colour, Obstable Detection & Pilot Assistance System
Software Design For An Extreme Vision, Signal Colour, Obstable Detection & Pilot Assi...
New Product Development – Metal Industry
New Product Development – Metal Industry
Plant Layout Design For A Press Systems Manufacturer
Plant Layout Design For A Press Systems Manufacturer