Project Control Forensic Delay Analysis For An Australian Metro

Project Control Forensic Delay Analysis For An Australian Metro

A leading Australian metro undertook a major expansion project for southwest line facing delays in regulatory approvals, threatening the project’s overall timeline.

We at Tooltech, supported them in their cost savings vision using – Forensic delay Analysis. The Impact was,
• Early Identification of potential regulatory delays at the project initiation phase.
Proactive Measures to enhance swift communication and collaboration with regulatory bodies. This led to a 20% reduction in approval delays. This avoided significant cost overruns.

Estimated Cost Savings: $2 million

Other Case Studies

Reverse Engineering & Product Improvisation Of A Skid Steer Loader
Reverse Engineering & Product Improvisation Of A Skid Steer Loader
EV car design
EV car design
Simulation Global Competency Centre Built For One Of Germany’s Big Three
Simulation Global Competency Centre Built For One Of Germany’s Big Three
Interior Engineering Development
Interior Engineering Development
Design of EV charging stations
Design of EV charging stations
Glass Façade Design
Glass Façade Design
Press Tool Design for Heat Exchanger Plates
Press Tool Design for Heat Exchanger Plates
Design Of Straight & Spiral Staricase
Design Of Straight & Spiral Staricase
Plant Layout Design For A Press Systems Manufacturer
Plant Layout Design For A Press Systems Manufacturer
Robotic BIW Fixture Design & Detailing
Robotic BIW Fixture Design & Detailing