Software Design For An Extreme Vision, Signal Colour, Obstable Detection & Pilot Assistance System

Software Design For An Extreme Vision, Signal Colour, Obstable Detection & Pilot Assistance System

In collaboration with VTT Technical Research Centre of Finland, we have developed an AI-driven vision and collision avoidance system designed for extreme weather conditions. The system integrates RADAR, multispectral cameras, satellite positioning data and AI software to detect obstacles and enhance situational awareness. Key components include image recognition, radar integration, sensor calibration, and adaptive AI models, ensuring high accuracy in low-visibility environments. The software was developed using QT creator & deep learning frameworks, enabling real-time decision-making and predictive analytics. The system significantly improves transportation safety by providing proactive alerts enabling a timely response.

Other Case Studies

Glass Façade Design
Glass Façade Design
Press Tool Design for Heat Exchanger Plates
Press Tool Design for Heat Exchanger Plates
Modelling & Library Creation
Modelling & Library Creation
New Product Development / Localization – Industrial Cleaning Equipment
New Product Development / Localization – Industrial Cleaning Equipment
Ev Charging Station Design
Ev Charging Station Design
PCB Design & Localization For An Automated Welding Equipment
PCB Design & Localization For An Automated Welding Equipment
Simulation Global Competency Centre Built For One Of Germany’s Big Three
Simulation Global Competency Centre Built For One Of Germany’s Big Three
New Product Development – Metal Industry
New Product Development – Metal Industry
Piping Design
Piping Design
Commissioning For Industry 4.0 Powertrain Factory
Commissioning For Industry 4.0 Powertrain Factory