Conversion Of Non – Pressurised Mixing Barrel Into A Pressure Vessel

Conversion Of Non – Pressurised Mixing Barrel Into A Pressure Vessel

We assisted in converting a non-pressurized mixing barrel into a pressure vessel while ensuring compliance with PED standards. Using ANSYS 2020R1, the project involved finite element modeling, stress analysis, and deformation evaluation. The analysis confirmed maximum deformations of 0.16mm (test pressure) and 0.08mm (working pressure), with Von-Mises stresses within.

Other Case Studies

Design Of Straight & Spiral Staricase
Design Of Straight & Spiral Staricase
Project Planning & Control And Forensic Delay Analysis For The Sydney Metro Project
Project Planning & Control And Forensic Delay Analysis For The Sydney Metro Project
Project Control Forensic Delay Analysis For An Australian Metro
Project Control Forensic Delay Analysis For An Australian Metro
E-mobility Manufacturing
E-mobility Manufacturing
Modelling & Library Creation
Modelling & Library Creation
Conversion Of An Existing Non-Pressurised Vessel To A Pressure Vessel As Per Ped Standards
Conversion Of An Existing Non-Pressurised Vessel To A Pressure Vessel As Per Ped Standards
Press Tool Design for Heat Exchanger Plates
Press Tool Design for Heat Exchanger Plates
In-Stage Quality Inspection For Metro Train Manufacturing
In-Stage Quality Inspection For Metro Train Manufacturing
Technical Documentation for Manufacturing & Factory Automation
Technical Documentation for Manufacturing & Factory Automation
Inspection & Supervision Support For Lng Tank Fabrication
Inspection & Supervision Support For Lng Tank Fabrication