Conversion Of Non – Pressurised Mixing Barrel Into A Pressure Vessel

Conversion Of Non – Pressurised Mixing Barrel Into A Pressure Vessel

We assisted in converting a non-pressurized mixing barrel into a pressure vessel while ensuring compliance with PED standards. Using ANSYS 2020R1, the project involved finite element modeling, stress analysis, and deformation evaluation. The analysis confirmed maximum deformations of 0.16mm (test pressure) and 0.08mm (working pressure), with Von-Mises stresses within.

Other Case Studies

Simulation team for BMW
Simulation team for BMW
Interiors Daimler
Interiors Daimler
Design of EV charging stations
Design of EV charging stations
In-Stage Quality Inspection For Metro Train Manufacturing
In-Stage Quality Inspection For Metro Train Manufacturing
Software Design For An Extreme Vision, Signal Colour, Obstable Detection & Pilot Assistance System
Software Design For An Extreme Vision, Signal Colour, Obstable Detection & Pilot Assi...
Universal CNC Machine Customisation
Universal CNC Machine Customisation
Reverse Engineering Of Diagnostic Equipment
Reverse Engineering Of Diagnostic Equipment
Inspection & Supervision Support For Lng Tank Fabrication
Inspection & Supervision Support For Lng Tank Fabrication
Project Control Forensic Delay Analysis For An Australian Metro
Project Control Forensic Delay Analysis For An Australian Metro
Conversion Of An Existing Non-Pressurised Vessel To A Pressure Vessel As Per Ped Standards
Conversion Of An Existing Non-Pressurised Vessel To A Pressure Vessel As Per Ped Standards