Simulation Global Competency Centre Built For One Of Germany’s Big Three

Simulation Global Competency Centre Built For One Of Germany’s Big Three

We built from scratch a 30-member team between the Client – Tooltech Deutschland – Tooltech India. The team started with 80:20 German: Indian content configuration and gradually moved to 20:80. To ensure seamless collaboration, we set up direct data lines to the client’s Germany office from both our Germany and India locations. This model delivered high satisfaction to both sides, especially as it was a pioneering setup at the time.

The scope of work included – Finite Element (FE) modelling activities, Full vehicle assembly and simulation, engineering calculations and validation, strength analysis including seat belt anchorage, crash analysis and structural performance studies, pedestrian safety analysis. All the work followed global regulatory compliance with US NCAP, Euro NCAP, FMVSS, AZT, and IIHS standards.

Other Case Studies

New Product Development / Localization – Industrial Cleaning Equipment
New Product Development / Localization – Industrial Cleaning Equipment
Simulation team for BMW
Simulation team for BMW
SAP Master Data Management & Procurement Support
SAP Master Data Management & Procurement Support
Piping Design
Piping Design
Platform Integration For A Metro Operator For Metropolitan Cities
Platform Integration For A Metro Operator For Metropolitan Cities
Gantry Layout for Crankshaft Machining Line
Gantry Layout for Crankshaft Machining Line
Design Of Straight & Spiral Staricase
Design Of Straight & Spiral Staricase
Project Control Forensic Delay Analysis For An Australian Metro
Project Control Forensic Delay Analysis For An Australian Metro
E-Mobility Station Design
E-Mobility Station Design
Plant Layout Design For A Press Systems Manufacturer
Plant Layout Design For A Press Systems Manufacturer