Project Control Forensic Delay Analysis For An Australian Metro

Project Control Forensic Delay Analysis For An Australian Metro

A leading Australian metro undertook a major expansion project for southwest line facing delays in regulatory approvals, threatening the project’s overall timeline.

We at Tooltech, supported them in their cost savings vision using – Forensic delay Analysis. The Impact was,
• Early Identification of potential regulatory delays at the project initiation phase.
Proactive Measures to enhance swift communication and collaboration with regulatory bodies. This led to a 20% reduction in approval delays. This avoided significant cost overruns.

Estimated Cost Savings: $2 million

Other Case Studies

Software Design For An Extreme Vision, Signal Colour, Obstable Detection & Pilot Assistance System
Software Design For An Extreme Vision, Signal Colour, Obstable Detection & Pilot Assi...
New Product Development / Localization – Industrial Cleaning Equipment
New Product Development / Localization – Industrial Cleaning Equipment
Path Programming For Robotic Welding In Door Closure Line
Path Programming For Robotic Welding In Door Closure Line
Application Development & New Product Development For Shipment Measurement System
Application Development & New Product Development For Shipment Measurement System
Inspection & Supervision Support For Lng Tank Fabrication
Inspection & Supervision Support For Lng Tank Fabrication
Powertrain Manufacturing Plant Commissioning
Powertrain Manufacturing Plant Commissioning
In-Stage Quality Inspection For Metro Train Manufacturing
In-Stage Quality Inspection For Metro Train Manufacturing
Design of EV charging stations
Design of EV charging stations
Design Of Straight & Spiral Staricase
Design Of Straight & Spiral Staricase
Press Tool Design for Heat Exchanger Plates
Press Tool Design for Heat Exchanger Plates