Project Control Forensic Delay Analysis For An Australian Metro

Project Control Forensic Delay Analysis For An Australian Metro

A leading Australian metro undertook a major expansion project for southwest line facing delays in regulatory approvals, threatening the project’s overall timeline.

We at Tooltech, supported them in their cost savings vision using – Forensic delay Analysis. The Impact was,
• Early Identification of potential regulatory delays at the project initiation phase.
Proactive Measures to enhance swift communication and collaboration with regulatory bodies. This led to a 20% reduction in approval delays. This avoided significant cost overruns.

Estimated Cost Savings: $2 million

Other Case Studies

Application Development & New Product Development For Shipment Measurement System
Application Development & New Product Development For Shipment Measurement System
Quick Usage Guides
Quick Usage Guides
Plant Layout Design For A Press Systems Manufacturer
Plant Layout Design For A Press Systems Manufacturer
Design of EV charging stations
Design of EV charging stations
Project Planning & Control And Forensic Delay Analysis For The Sydney Metro Project
Project Planning & Control And Forensic Delay Analysis For The Sydney Metro Project
Gantry Layout for Crankshaft Machining Line
Gantry Layout for Crankshaft Machining Line
Powertrain Manufacturing Plant Commissioning
Powertrain Manufacturing Plant Commissioning
E-mobility Manufacturing
E-mobility Manufacturing
Operations & Maintenance Assessment For A Metro Major
Operations & Maintenance Assessment For A Metro Major
Vendor Development For An Italian Automotive Leader
Vendor Development For An Italian Automotive Leader