Project Control Forensic Delay Analysis For An Australian Metro

Project Control Forensic Delay Analysis For An Australian Metro

A leading Australian metro undertook a major expansion project for southwest line facing delays in regulatory approvals, threatening the project’s overall timeline.

We at Tooltech, supported them in their cost savings vision using – Forensic delay Analysis. The Impact was,
• Early Identification of potential regulatory delays at the project initiation phase.
Proactive Measures to enhance swift communication and collaboration with regulatory bodies. This led to a 20% reduction in approval delays. This avoided significant cost overruns.

Estimated Cost Savings: $2 million

Other Case Studies

3D Web Library Creation
3D Web Library Creation
E-Mobility Station Design
E-Mobility Station Design
Conversion Of Non – Pressurised Mixing Barrel Into A Pressure Vessel
Conversion Of Non – Pressurised Mixing Barrel Into A Pressure Vessel
Design Automation / New Variant Creation – Press Systems Equipment (Glue Blender)
Design Automation / New Variant Creation – Press Systems Equipment (Glue Blender)
Project Planning & Control And Forensic Delay Analysis For The Sydney Metro Project
Project Planning & Control And Forensic Delay Analysis For The Sydney Metro Project
Screw Conveyor Design
Screw Conveyor Design
Reverse Engineering Of Diagnostic Equipment
Reverse Engineering Of Diagnostic Equipment
Piping Design
Piping Design
Design of EV charging stations
Design of EV charging stations
Interiors Daimler
Interiors Daimler