Project Control Forensic Delay Analysis For An Australian Metro

Project Control Forensic Delay Analysis For An Australian Metro

A leading Australian metro undertook a major expansion project for southwest line facing delays in regulatory approvals, threatening the project’s overall timeline.

We at Tooltech, supported them in their cost savings vision using – Forensic delay Analysis. The Impact was,
• Early Identification of potential regulatory delays at the project initiation phase.
Proactive Measures to enhance swift communication and collaboration with regulatory bodies. This led to a 20% reduction in approval delays. This avoided significant cost overruns.

Estimated Cost Savings: $2 million

Other Case Studies

Quick Usage Guides
Quick Usage Guides
Simulation Global Competency Centre Built For One Of Germany’s Big Three
Simulation Global Competency Centre Built For One Of Germany’s Big Three
E-mobility Manufacturing
E-mobility Manufacturing
Design of EV charging stations
Design of EV charging stations
Inspection & Supervision Support For Lng Tank Fabrication
Inspection & Supervision Support For Lng Tank Fabrication
Technical Documentation for Manufacturing & Factory Automation
Technical Documentation for Manufacturing & Factory Automation
New Product Development / Localization – Industrial Cleaning Equipment
New Product Development / Localization – Industrial Cleaning Equipment
In-Stage Quality Inspection For Metro Train Manufacturing
In-Stage Quality Inspection For Metro Train Manufacturing
Project Planning & Control And Forensic Delay Analysis For The Sydney Metro Project
Project Planning & Control And Forensic Delay Analysis For The Sydney Metro Project
Reverse Engineering & Product Improvisation Of A Skid Steer Loader
Reverse Engineering & Product Improvisation Of A Skid Steer Loader