Project Control Forensic Delay Analysis For An Australian Metro

Project Control Forensic Delay Analysis For An Australian Metro

A leading Australian metro undertook a major expansion project for southwest line facing delays in regulatory approvals, threatening the project’s overall timeline.

We at Tooltech, supported them in their cost savings vision using – Forensic delay Analysis. The Impact was,
• Early Identification of potential regulatory delays at the project initiation phase.
Proactive Measures to enhance swift communication and collaboration with regulatory bodies. This led to a 20% reduction in approval delays. This avoided significant cost overruns.

Estimated Cost Savings: $2 million

Other Case Studies

Reverse Engineering & Product Improvisation Of A Skid Steer Loader
Reverse Engineering & Product Improvisation Of A Skid Steer Loader
Value Engineering & Product Localisation – Welding Equipment
Value Engineering & Product Localisation – Welding Equipment
Hydrogen Refuelling Station Design
Hydrogen Refuelling Station Design
Application Development & New Product Development For Shipment Measurement System
Application Development & New Product Development For Shipment Measurement System
Gantry Layout for Crankshaft Machining Line
Gantry Layout for Crankshaft Machining Line
New Product Development – Metal Industry
New Product Development – Metal Industry
Electrical Design Optimization And Localisation
Electrical Design Optimization And Localisation
Inspection & Supervision Support For Lng Tank Fabrication
Inspection & Supervision Support For Lng Tank Fabrication
Screw Conveyor Design
Screw Conveyor Design
New Product Development / Localization – Industrial Cleaning Equipment
New Product Development / Localization – Industrial Cleaning Equipment