Project Control Forensic Delay Analysis For An Australian Metro

Project Control Forensic Delay Analysis For An Australian Metro

A leading Australian metro undertook a major expansion project for southwest line facing delays in regulatory approvals, threatening the project’s overall timeline.

We at Tooltech, supported them in their cost savings vision using – Forensic delay Analysis. The Impact was,
• Early Identification of potential regulatory delays at the project initiation phase.
Proactive Measures to enhance swift communication and collaboration with regulatory bodies. This led to a 20% reduction in approval delays. This avoided significant cost overruns.

Estimated Cost Savings: $2 million

Other Case Studies

E-Mobility Station Design
E-Mobility Station Design
Offshore Development Centre Built Through A Mix Model
Offshore Development Centre Built Through A Mix Model
Path Programming For Robotic Welding In Door Closure Line
Path Programming For Robotic Welding In Door Closure Line
E-mobility Manufacturing
E-mobility Manufacturing
Interiors Daimler
Interiors Daimler
Software Design For An Extreme Vision, Signal Colour, Obstable Detection & Pilot Assistance System
Software Design For An Extreme Vision, Signal Colour, Obstable Detection & Pilot Assi...
Design of multiple Conveyor Types for Panel Board Manufacturing Plant
Design of multiple Conveyor Types for Panel Board Manufacturing Plant
Screw Conveyor Design
Screw Conveyor Design
Operations & Maintenance Assessment For A Metro Major
Operations & Maintenance Assessment For A Metro Major
Floating Villa Design
Floating Villa Design