Project Control Forensic Delay Analysis For An Australian Metro

Project Control Forensic Delay Analysis For An Australian Metro

A leading Australian metro undertook a major expansion project for southwest line facing delays in regulatory approvals, threatening the project’s overall timeline.

We at Tooltech, supported them in their cost savings vision using – Forensic delay Analysis. The Impact was,
• Early Identification of potential regulatory delays at the project initiation phase.
Proactive Measures to enhance swift communication and collaboration with regulatory bodies. This led to a 20% reduction in approval delays. This avoided significant cost overruns.

Estimated Cost Savings: $2 million

Other Case Studies

Offshore Development Centre Built Through A Mix Model
Offshore Development Centre Built Through A Mix Model
Operations & Maintenance Assessment For A Metro Major
Operations & Maintenance Assessment For A Metro Major
EV car design
EV car design
Glass Façade Design
Glass Façade Design
Design Automation / New Variant Creation – Press Systems Equipment (Glue Blender)
Design Automation / New Variant Creation – Press Systems Equipment (Glue Blender)
New Product Development / Localization – Industrial Cleaning Equipment
New Product Development / Localization – Industrial Cleaning Equipment
E-Mobility Station Design
E-Mobility Station Design
E-mobility Manufacturing
E-mobility Manufacturing
Interiors Daimler
Interiors Daimler
Hydrogen Refuelling Station Design
Hydrogen Refuelling Station Design