Project Planning & Control And Forensic Delay Analysis For The Sydney Metro Project

Project Planning & Control And Forensic Delay Analysis For The Sydney Metro Project

A leading transportation and infrastructure company in Australia approached Tooltech to provide services for Project Planning and Control and Forensic Delay analysis.

We developed a comprehensive schedule that outlines the sequence of activities, dependencies, and timelines for each task within the program while monitoring the progress of the project against the established schedule and budget and prepare various dashboards.

In addition, we analyzed any variances between planned and actual performance to identify areas where corrective action may be required. And the critical path of the project to understand how delays affect the overall timeline.

Some other tasks were as below:

  • Quantified the impact of delays on the project schedule and cost.
  • Prepared upstream claims for EoT and review the claims submitted by contractor.

Prepared and monitored budget of the project and generated required reports

Other Case Studies

Design of EV charging stations
Design of EV charging stations
New Product Development – Metal Industry
New Product Development – Metal Industry
Simulation team for BMW
Simulation team for BMW
Universal CNC Machine Customisation
Universal CNC Machine Customisation
E-mobility Manufacturing
E-mobility Manufacturing
Modelling & Library Creation
Modelling & Library Creation
Reverse Engineering Of Diagnostic Equipment
Reverse Engineering Of Diagnostic Equipment
In-Stage Quality Inspection For Metro Train Manufacturing
In-Stage Quality Inspection For Metro Train Manufacturing
Hydrogen Refuelling Station Design
Hydrogen Refuelling Station Design
Screw Conveyor Design
Screw Conveyor Design