Conversion Of Non – Pressurised Mixing Barrel Into A Pressure Vessel

Conversion Of Non – Pressurised Mixing Barrel Into A Pressure Vessel

We assisted in converting a non-pressurized mixing barrel into a pressure vessel while ensuring compliance with PED standards. Using ANSYS 2020R1, the project involved finite element modeling, stress analysis, and deformation evaluation. The analysis confirmed maximum deformations of 0.16mm (test pressure) and 0.08mm (working pressure), with Von-Mises stresses within.

Other Case Studies

Simulation team for BMW
Simulation team for BMW
Electrical Design Optimization And Localisation
Electrical Design Optimization And Localisation
Design Of Straight & Spiral Staricase
Design Of Straight & Spiral Staricase
Modelling & Library Creation
Modelling & Library Creation
In-Stage Quality Inspection For Metro Train Manufacturing
In-Stage Quality Inspection For Metro Train Manufacturing
Value Engineering & Product Localisation – Welding Equipment
Value Engineering & Product Localisation – Welding Equipment
Powertrain Manufacturing Plant Commissioning
Powertrain Manufacturing Plant Commissioning
New Product Development – Metal Industry
New Product Development – Metal Industry
E-Mobility Station Design
E-Mobility Station Design
Project Control Forensic Delay Analysis For An Australian Metro
Project Control Forensic Delay Analysis For An Australian Metro